Housing development, Debiut, Pruszcz Gdański

Generalny Wykonawca
Inpro
Lokalizacja
Pruszcz Gdański, Polska
Data
2021
Rodzaj Inwestycji
Residential Development
Dostarczone rozwiązania
Bauframe formwork systems
“Maintaining the smooth flow of reinforced concrete works was crucial, and the Bauframe system made it possible to combine rapid assembly, flexible adaptation to the wall layout, and efficient execution of subsequent construction phases.”
Main challenges of the project
The key challenge was maintaining the smooth flow of wall works throughout the successive stages of the housing development. In a residential project delivered according to a phased schedule, efficient formwork organisation, smooth equipment logistics, and the ability to quickly adapt the system to new work fronts were all of great importance. As a result, the construction site was able to maintain the pace of work and achieve better control over the schedule.
Bauframe in the Debiut Housing Development project
The Bauframe system supported the efficient execution of wall works throughout the successive stages of the project. hanks to its versatile design and adaptability to various wall configurations, the system made it possible to better organise reinforced concrete works, maintain a high pace of construction, and effectively support site logistics.
In practice, this meant greater flexibility on site, faster formwork preparation, and better control over the progress of the project.
Equipment and formwork supplied
- Bauframe formwork systems
Photo gallery
Other projects
Are you interested in purchasing equipment?
Contact us using phone or WhatsApp.
Call us
+48 570 555 579Write on WhatsApp
Send a message








