Height up to 60 m
Facade scaffolding P70
The P70 Plettac-type scaffolding system is based on hot-dip galvanized steel frames and is designed to enclose structures of various shapes and heights. One worker can assemble up to 250 m² per day — without specialist tools.
Assembly up to 250 m²/day
Assembly without specialist tools
Compatibility with Plettac
Switch between pieces of information by clicking on the tabs.
Basic information
Lift height
2.0 m (supplementary heights: 0.5 / 1.0 / 1.5 m)
Lift width
0.74 m (supplementary width: 1.10 m)
Working platform load
2.00 kN/m² – load class 3 according to PN-EN 12811-1:2003
Max. height (without structural calculations)
24 m
Max. height (with structural calculations)
60 m
Platforms
steel, timber and aluminium-plywood
Widening brackets
0.32 / 0.64 / 0.74 / 0.96 / 1.10 m
Bay length
3.0 / 2.5 / 2.0 / 1.5 / 1.10 / 0.74 m
Protection of steel components
anti-corrosion galvanizing
Protection of timber components
impregnation
Working area protection
safety net or tarpaulin
Basic information
Shipping to
All of Poland and EU countries
Delivery method
Full container and pallet loads, delivered directly to the construction site or the customer’s warehouse
Lead time
24–48 hours for items available from stock
Minimum order
The required scaffolding size, including accessories, is quoted based on the project.
Offer for contractors and wholesalers
Special terms for contractors and wholesalers – ask for a sales offer
Do you need a quote for a specific scaffolding size?
Make a call
Write on WhatsApp
Frame facade scaffolding for work at heights of up to 60 m
P70 frame scaffolding is a system of prefabricated steel components that allows building façades to be enclosed quickly and safely – from simple residential buildings to complex industrial structures reaching heights of up to 60 m. Hot-dip galvanized frames, self-locking spigots and compatibility with different storey heights provide full flexibility in adapting the scaffolding to the shape of the building, reducing assembly time and labour costs.
What makes P70 scaffolding stand out?

Fast assembly without specialist tools
The intuitive design of the P70 system allows one person to assemble up to 250 m² of scaffolding per day without the use of specialist equipment. Faster assembly means shorter project completion times and lower labour costs on every job.

Flexible adaptation to the building
Lengths of 3.0 m / 2.5 m / 2.0 m / 1.5 m / 1.10 m / 0.74 m and additional heights of 0.5 m / 1.0 m / 1.5 m allow the scaffolding geometry to be precisely adapted to any building. Widening brackets from 0.32 m to 1.10 m make it possible to extend the working platform where required by the shape of the façade.

Working at heights of up to 60 m
Without additional structural calculations, the P70 system can be erected up to a height of 24 m, and with structural calculations – up to 60 m. One system can therefore be used for both typical multi-storey residential buildings and high-rise industrial or commercial structures.

Hot-dip galvanizing of steel components
All steel components of the system are hot-dip galvanized, providing corrosion resistance in harsh construction site weather conditions. The longer service life of the components reduces replacement costs and ensures reliable use for many years.

Self-locking spigots and reinforced safety connections
Rigid frame connections and self-locking spigots eliminate the risk of accidental platform disconnection when working at height. Guardrail posts with safety locking and the UNI double end guardrail create a complete protective zone in accordance with occupational safety requirements.

Three types of working platforms
The P70 system is compatible with steel, wooden and aluminium-plywood platforms, including a version equipped with an access hatch and internal ladder. Load class 3 according to PN-EN 12811-1 (2.00 kN/m²) allows typical façade and finishing works to be carried out safely.

Full compatibility with Plettac-type systems
The P70 system is fully compatible with other Plettac-type systems, allowing it to be combined with existing scaffolding without the need to replace the entire system. The option to expand the set gradually reduces the number of stock items and simplifies logistics on the construction site.

Protection of the working area
The option to install safety netting or sheeting across the entire scaffolding surface helps protect workers and the surrounding area from falling materials and adverse weather conditions. This solution is particularly important for work in city centres and around public buildings.

Ask for a quote for P70 scaffolding – for your construction project or wholesale offer.
We’ll select the required number of components, prepare a quotation and confirm availability within 24 hours.
Make a call
Write on WhatsApp
Index P70 scaffolding
7400000230
EYEBOLT 230
0,2
7400000280
EYEBOLT 280
0,25
7400000350
EYEBOLT 350
0,35
7400003434
SWIVEL COUPLER 34/34
1,075
7400004200
STEEL LATTICE GRIDER 420
40
7400004848
SWIVEL COUPLER 48/48
1,5
7400007700
STEEL LATTICE GRIDER 770
79
7400024848
DOUBLE CLAMP 48/48MM LIGHT
1,24
7400034848
SWIVEL CLAMP 48/48MM LIGHT
1,1
7460000005
END TOEBOARD 0,70M P70
2
Download our catalogues
Ask for a quote for P70 scaffolding – for your construction project or wholesale offer.
We’ll select the required number of components, prepare a quotation and confirm availability within 24 hours.
Make a call
+48 786 100 358Write a message
Send a message

