P70 Scaffolding

Frame façade scaffolding for work at heights up to 60 m.

The P70 scaffolding system of the Plettac type is based on hot-dip galvanized steel frames, designed to surround structures of various shapes and heights. A single worker can assemble up to 250 m² per day – without specialist tools.

hero_3

Assembly up to 250 m²/day

No specialist tools required

Height up to 60 m

Maximum height up to 60 m

Compatibility with Plettac

Fully compatible with the Plettac type

Switch between pieces of information by clicking on the tabs.

Scaffolding for every type of project

The P70 frame scaffolding is a system of prefabricated steel components that allows you to quickly and safely surround a building façade – from simple residential buildings to complex industrial structures reaching 60 m in height. Hot-dip galvanized frames, self-locking pins and adaptation to various storey lengths provide full freedom to adjust the scaffolding to the shape of the structure, shortening assembly time and reducing labor costs.

Technical information

Lift height

2.0 m (supplementary heights: 0.5 / 1.0 / 1.5 m)

Lift width

0.74 m (supplementary width: 1.10 m)

Working platform load

2.00 kN/m² – load class 3 according to PN-EN 12811-1:2003

Max. height (without structural calculations)

24 m

Max. height (with structural calculations)

60 m

Platforms

steel, timber and aluminium-plywood

Widening brackets

0.32 / 0.64 / 0.74 / 0.96 / 1.10 m

Bay length

3.0 / 2.5 / 2.0 / 1.5 / 1.10 / 0.74 m

Protection of steel components

anti-corrosion galvanizing

Protection of timber components

impregnation

Working area protection

safety net or tarpaulin

7b3af35df685b49e47091a292b0d75a767e8c742

Are you interested in P70 scaffolding?

We will list the number of elements required for your project, provide a quotation, and confirm availability within 24 hours. Contact us using phone or WhatsApp.

Make a call

Write on WhatsApp

Product features

cecha1

Fast assembly without specialist tools

The intuitive design of the P70 system allows one person to assemble up to 250 m² of scaffolding per day without using specialist equipment. Faster assembly means shorter project completion times and lower labor costs on every job.

cecha2

Flexible adaptation to the building

Lengths of 3.0 m / 2.5 m / 2.0 m / 1.5 m / 1.10 m / 0.74 m and supplementary heights of 0.5 m / 1.0 m / 1.5 m make it possible to precisely adapt the geometry of the scaffolding to any structure. Extension brackets with dimensions from 0.32 m to 1.10 m allow additional projection of the working platform where required by the shape of the façade.

cecha_ang

Working at heights up to 60 m

Without additional structural calculations, the P70 system reaches a height of 24 m, and after performing structural calculations – up to 60 m. It is one system that supports both standard multi-family buildings and tall industrial or commercial structures.

cecha4_ocynk

Hot-dip galvanizing of steel components

All steel components of the system are hot-dip galvanized, which ensures corrosion resistance in harsh weather conditions on the construction site. Longer service life of the components means lower costs when it is necessary to purchase new elements and more reliable operation for many years.

cecha_5-trzpien

Self-locking pins and reinforced health-and-safety connections

Rigid frame connections and self-locking pins eliminate the risk of accidental disconnection of decks during work at height. Guardrail posts with safety locking and the double UNI front guardrail create a complete protection zone compliant with health-and-safety requirements.

ocecha_6

Three types of working decks

The P70 system is compatible with steel, wooden and aluminum-plywood decks, including a version equipped with a flap and an internal ladder. Load class 3 according to PN-EN 12811-1 (2.00 kN/m²) allows safe execution of standard façade and finishing works.

cecha_7

Full compatibility with the Plettac type

The P70 system is fully compatible with other Plettac-type systems, which allows it to be combined with existing scaffolding without having to replace the entire system. The possibility of gradual expansion of the set reduces the number of stock indices and simplifies logistics on site.

sekcja8

Protection of the working surface

The option of installing safety netting or tarpaulins over the entire scaffolding surface makes it possible to protect workers and the surroundings from falling materials and adverse weather conditions. This solution is particularly important for work in city centers and on public utility buildings.

Are you interested in purchasing equipment?
Contact us using phone or WhatsApp.

Write on WhatsApp

Send a message
P70 Scaffolding